Heavy Equipment Guide Logo

Adoil Inc.

Address B11 416 Meridian Rd. SE, Calgary, T2A 1X2, CA
Phone 403-242-2201
Email [email protected]
Website adoil.net

Adoil Inc. is a company based in Calgary concentrating on protecting our fragile environment. 

We manufacture quality environmental wellhead containment units. We work closely with oil companies that adhere to a policy of intolerance towards any oil, saltwater, injected fluid ,and dangerous gasses, leaking to the environment.

Our wellhead containment unit  TITAN®  is made of cast aluminum with a transparent   polycarbonate top and an emergency shutdown switch. The TITAN® can be installed in minutes without the use of special tools and once properly installed will notify the users when the well needs attention.

The TITAN® containment device captures all oil and produced saltwater that commonly cause ground surface pollution and water table contamination. We have approximately 10,000  TITAN®  in service around Western Canada, US, and Mexico.

 

Related Articles

Spill containment system

The Titan spill containment system is designed specifically to deal with wellhead seepage problems and works by capturing oil and produced water that escapes the wellhead due to repetitive rod motion and common seal wear. This system is much like the anti-freeze overflow containment systems mandatory on vehicles, it fits all wellhead stuffing box types, is compatible with all artificial lift systems and will protect both ground and surface water beyond ERCB/EPA compliance. It is also designed to fit all rod lubricators and pressure switches, and to be strong enough to stand up to freezing winters and sweltering summers.   

Spill containment system designed to deal specifically with wellhead seepage

The Titan spill containment system is designed specifically to deal with wellhead seepage problems and works by capturing oil and produced water that escapes the wellhead due to repetitive rod motion and common seal wear. Units are designed to be simple to use and do not require the operator to leave the truck on their daily lease visits, which saves time. Plus, the complete unit can be installed in under 30 minutes, without tools and by most non-technical personnel.